Standard Cost System, Use

A standard costing system involves estimating the required costs of a production process. But before the start of the accounting period, determine the standards and set regarding the amount and cost of direct materials required for the production process and the amount and pay rate of direct labor required for the production process. In addition, these standards are used to plan a budget for the production process.

Standard costing compares the standard costs and revenues with the actual results of the process, finds the reasons for the variances, provides information about deviations to management for taking steps to improve it.

Standard costing is the practice of substituting an expected cost for an actual cost in the accounting records. Subsequently, variances are recorded to show the difference between the expected and actual costs. This approach represents a simplified alternative to cost layering systems, such as the FIFO and LIFO methods, where large amounts of historical cost information must be maintained for inventory items held in stock.

Standard costing involves the creation of estimated (i.e., standard) costs for some or all activities within a company. The core reason for using standard costs is that there are a number of applications where it is too time-consuming to collect actual costs, so standard costs are used as a close approximation to actual costs.

At the end of the accounting period, use the actual amounts and costs of direct material. Then utilize the actual amounts and pay rates of direct labor to compare it to the previously set standards. When you compare the actual costs to the standard costs and examine the variances between them, it allows managers to look for ways to improve cost control, cost management, and operational efficiency.

There are both advantages and disadvantages to using a standard costing system. The primary advantages to using a standard costing system are that it can be used for product costing, for controlling costs, and for decision-making purposes.

Whereas the disadvantages include that implementing a standard costing system can be time consuming, labor intensive, and expensive. If the cost structure of the production process changes, then update the standards.

Since standard costs are usually slightly different from actual costs, the cost accountant periodically calculates variances that break out differences caused by such factors as labor rate changes and the cost of materials. The cost accountant may periodically change the standard costs to bring them into closer alignment with actual costs.

Standard costs of these inputs:

  1. Direct materials
  2. Direct labor
  3. Manufacturing overhead
  • Variable manufacturing overhead
  • Fixed manufacturing overhead

Uses of Standard Costing

Though most companies do not use standard costing in its original application of calculating the cost of ending inventory, it is still useful for a number of other applications. In most cases, users are probably not even aware that they are using standard costing, only that they are using an approximation of actual costs. Here are some potential uses:

Inventory costing. It is extremely easy to print a report showing the period-end inventory balances (if you are using a perpetual inventory system), multiply it by the standard cost of each item, and instantly generate an ending inventory valuation. The result does not exactly match the actual cost of inventory, but it is close. However, it may be necessary to update standard costs frequently, if actual costs are continually changing. It is easiest to update costs for the highest-dollar components of inventory on a frequent basis, and leave lower-value items for occasional cost reviews.

Budgeting. A budget is always composed of standard costs, since it would be impossible to include in it the exact actual cost of an item on the day the budget is finalized. Also, since a key application of the budget is to compare it to actual results in subsequent periods, the standards used within it continue to appear in financial reports through the budget period.

Price formulation. If a company deals with custom products, then it uses standard costs to compile the projected cost of a customer’s requirements, after which it adds a margin. This may be quite a complex system, where the sales department uses a database of component costs that change depending upon the unit quantity that the customer wants to order. This system may also account for changes in the company’s production costs at different volume levels, since this may call for the use of longer production runs that are less expensive.

Overhead application. If it takes too long to aggregate actual costs into cost pools for allocation to inventory, then you may use a standard overhead application rate instead, and adjust this rate every few months to keep it close to actual costs.

One thought on “Standard Cost System, Use